Retaining Wall Block Calculator: Blocks, Caps and Drainage Rock
Count blocks and caps from the courses you will actually stack, then the leveling pad and the drainage rock behind the face. This is a material takeoff. It does not design the wall.
Order this
Working…
Blocks and caps
- Courses, including burial
- —
- Blocks per course
- —
- Blocks before the last round
- —
- Blocks to order
- —
- Caps before rounding
- —
- Caps to order
- —
Leveling pad
- In place
- —
- Loose volume
- —
- Exact tons
- —
- Order
- —
Drainage rock behind the wall
- Volume
- —
- Tons
- —
- Filter fabric
- —
Including cores
- Core fill
- —
- Rock including cores
- —
Toe drain
- Pipe
- —
With these numbers
Units and assumptions
- Input units
- Length and exposed height in feet. Burial, block face, caps, pad, and drainage zone in inches. Metric mode uses meters and centimeters. Weight is US short tons.
- Density default
- Leveling pad 1.40 loose tons per cubic yard. Drainage rock 1.35. Basis: published loose figures for crushed base and open drainage stone. An 18 by 8 inch face is a common modular block.
- Compaction
- The pad is compacted. This example uses 20% extra loose volume. A usual crushed-base start is 25%. Drainage rock is open-graded and gets no compaction allowance.
- Waste
- Sensible default 5%, applied after whole courses are counted and before the final block and cap round-up.
- Rounding
- Courses and blocks per course round up first. The block and cap orders then round up to a whole unit. Pad tons round up to the next 0.5 ton.
- Supplier check
- Results are estimates. Confirm quantities with your supplier. This page does not design the wall or decide a permit.
The formula
Courses = round up( (exposed height + burial) ÷ block height ). Blocks per course = round up( length ÷ block length ). Both of those round up first, because you cannot set a fraction of a block in a course. Blocks to order = round up( courses × blocks per course × (1 + waste) ).
Caps = round up( length ÷ cap length × (1 + waste) ). Waste is inside the round-up. Rounding the caps first and then adding waste counts a different number.
Pad volume = length × width × depth ÷ 27, then × (1 + compaction allowance) for the loose cubic yards, then × loose density for tons. Drainage rock behind the wall = length × (exposed + burial) × zone depth ÷ 27, with no compaction allowance. Core fill is added only when you enter a cubic-foot volume per block. Geogrid is not calculated.
Worked example
A 40 foot wall, 3 feet exposed, 6 inches of burial, 18 by 8 inch face block, 18 inch caps, 5% waste. The pad is 18 inches wide and 6 inches deep, compacted, at 1.40 tons per cubic yard and 20% extra loose volume. Drainage rock is 12 inches behind the wall at 1.35 tons per cubic yard, with no core fill entered.
- 6 courses and 27 blocks per course. 170.1 blocks before rounding, order 171. Caps: order 28.
- Pad 1.111 yd³ in place, 1.333 loose, 1.87 tons.
- Drainage rock 5.19 yd³, 7.00 tons. Cores are not in that figure.
Starting points
Block face, cap length, pad size, and the drainage zone all come from the product and the detail, not from a universal wall. An 18 by 8 inch face is a common modular block, about one block per square foot of face before the course rounding. Some systems run nearer 1.5 units per square foot. Enter that unit’s real face size. Burial below the greater of 6 inches and 1 inch per 8 inches of exposed height gets an information note. That note is manufacturer guidance, not a permit limit.
Permit and engineering requirements for retaining walls vary by jurisdiction, wall height, soil, slopes, and loads above the wall. Verify with your local building department. This page provides material quantities only.
Geogrid length and spacing come from the engineer or the manufacturer. This page does not size geogrid.
A perforated toe drain is a common manufacturer suggestion once the exposed wall is above about 4 feet. It is not a permit threshold. Turn the drain on if your detail includes one.
| Piece | Starting point | In the example |
|---|---|---|
| Block face | 18 in long × 8 in high | 6 courses, 27 blocks per course |
| Cap | 18 in | 28 caps after 5% waste |
| Burial | Greater of 6 in and height/8 | 6 in on a 3 ft wall |
| Leveling pad | 18 in wide × 6 in compacted | 20% allowance in the example; 25% is the usual base start |
| Drainage zone | 12 in behind the face | Open rock, no compaction factor |
| Waste | 5% | After whole courses are counted |
Questions
How many blocks for a 40 foot wall 3 feet tall?
With 6 inches of burial and an 8 inch block, that wall is 6 courses. At 18 inches long, each course is 27 blocks. Times 5% waste, order 171 blocks.
How many caps do I need?
Forty feet of 18 inch caps is 26.67 caps. With 5% waste that is 28 even, so the order is 28 caps. Waste is applied before the round-up.
How much drainage rock goes behind a wall?
For this 40 foot wall, 3.5 feet tall including burial and 12 inches of rock behind the face, the volume is 5.19 cubic yards, about 7.00 tons at 1.35. Add core fill only if the block manufacturer publishes it.
Does this tell me if I need a permit?
No. Permit and engineering rules depend on the jurisdiction, the height, the soil, and what sits above the wall. The notice on this page does not use a universal height limit. Confirm the project with your building department. The quantities are materials only.